Many enquiries come months before the keys. A rotation that stays useful, not pushy:
- Month 1: a finished home of similar size, with two or three photos.
- Month 2: what to decide before possession: electrical points, AC positions, kitchen layout.
- Month 3: your payment stages. A common Indian pattern is 30 to 40 percent to begin, 30 percent midway, 20 percent near the end and 10 percent at handover.
- Month 4: “Is possession still on track for March?”
- Month 5: timelines. A 2BHK typically takes 45 to 60 days and a 3BHK 60 to 90, so design should start before the keys.
- Possession month: an invitation to visit the flat together.
The sheet needs only: name, property, locality, budget, possession month, last message sent.